IT preventive maintenance checklist: free spreadsheet

Fourteen maintenance tasks already sorted by frequency and criticality, with who approves them and a log tab to prove what was done.

Micronuage team · · 2 min read

Download the template

Version 1.0 · CC BY 4.0 licence · free, no sign-up. Examples are fictional.

Preview of the "Tasks" tab

TaskFrequencyCriticalityScopeOwnerApproval needed?Approved byTime window
Check backup alerts and completionDailyHighFile server and cloudITNoStart of day
Check antivirus or EDR alertsDailyHighAll computersITNoStart of day
Find disks with less than 15% free spaceWeeklyMediumAll computersITNoMonday morning
Restart computers with a pending restartWeeklyMediumPending computersITNoFriday after 6 p.m.
Install Windows security updates (pilot, then all)MonthlyHighAll computersITYesOffice manager2nd week, after 6 p.m.

Preview of the "Log" tab

DateTaskAsset or scopeDone byApproval (reference)ResultNotesNext run
2026-11-02Check backup alerts and completionFile serverIT technicianOKNightly backup completed2026-11-03
2026-11-09Find disks with less than 15% free spacePC-07 (disk 9% free)IT technicianOK with issuesTemporary files removed; now 22% free2026-11-16
2026-11-10Install Windows security updates (pilot, then all)Pilot group (3 PCs)IT technicianWO-2026-118OKNo issues in the pilot2026-11-12
2026-11-12Install Windows security updates (pilot, then all)Remaining 25 PCsIT technicianWO-2026-118OK with issuesLAPTOP-04 was off; updated on the 13th2026-12-08
2026-11-12Update browsers and main applicationsAll computersIT technicianWO-2026-118OKBrowsers on current version2026-12-08

How to use it

  1. In the "Tasks" tab, review the 14 sample tasks: adjust frequency, scope and owner to your business.
  2. Set "Approval needed?" to Yes for anything that can interrupt work, and name who approves.
  3. Each time a task runs, add a row in the "Log" tab with date, who did it, result and next date.
  4. Approved tasks carry the reference of the work order or approval email.
  5. Once a month, filter the log on "Failed" and "Postponed" and handle those first.

30-second summary

  • Each task has a frequency (daily to yearly), a criticality (high, medium, low) and says whether it needs approval.
  • The "Log" tab records date, who did it, approval, result and next run for each task.
  • The filled-in example shows one full month at a fictitious 28-computer business.

Switch to automatic tracking. The Micronuage platform keeps this information up to date for every Windows computer. 7-day free trial, no credit card.

Try it free
On this page
  1. What is IT preventive maintenance?
  2. Which tasks does the spreadsheet include?
  3. How do you use approval and the log?
  4. Can you do this without stopping work?

What is IT preventive maintenance?

It is the set of tasks done on planned dates to prevent failures: checking backups, installing updates, freeing disk space, reviewing access. Corrective maintenance reacts to problems; preventive maintenance reduces how many you get.

The spreadsheet sorts these tasks by frequency and criticality, shows which need approval and keeps a log of every run.

Which tasks does the spreadsheet include?

Fourteen sample tasks, ready to adjust. The table sums up the logic.

FrequencyExamplesApproval needed?
DailyBackup and antivirus alertsNo (read-only)
WeeklyLow disk space, pending restartsNo
MonthlyWindows and application updatesYes: they may require a restart
QuarterlyRestore test, account and licence reviewYes, for most
Twice a year and yearlyFirmware, inventory, batteries, incident drillDepends on the task

Criticality (high, medium, low) shows what cannot slip. A postponed high-criticality task should be rescheduled within the same week.

How do you use approval and the log?

  1. Set "Approval needed?" to Yes for anything that can interrupt work, and name the approver by role.
  2. Agree on a time window outside peak hours and warn users beforehand.
  3. Log each run with date, asset, who did it, approval reference and result.
  4. For every "Failed", open a work order with the IT work order template.

Review the spreadsheet every six months. Tasks that never find a problem can run less often; tasks that fail often point to a root cause that deserves its own project. Keep the log for at least a year: it shows what was done when someone asks after an incident.

Can you do this without stopping work?

Yes, in most cases: with after-hours windows, pilot groups and tools that schedule installation. The guide to remote computer maintenance shows how, and the computer update policy helps formalize deadlines and exceptions. For the most important quarterly task, see how to test a backup restore.

FAQ

Does every task need approval?

No. Only those that can interrupt work or change the environment, such as installing updates, touching firmware or testing a restore. Read-only checks, such as reviewing alerts, do not.

What is the difference between preventive and corrective maintenance?

Preventive work happens on planned dates to avoid failures. Corrective work responds to a problem that already happened, usually through a support ticket or work order.

What if a task fails?

Record "Failed" with the reason, open a work order for the fix and set a new run date.